For the first time since June 20, users of the Mercier Bridge going to and from work will be able to enjoy two lanes in each direction.
The summer long construction blitz on the provincially-owned side of the span was completed over the weekend, about a day ahead of schedule.
With the major repairs complete, the toll bridge on Highway 30 between Vaudreuil-Soulanges and Salaberry-de-Valleyfield will no longer be free for truckers.
The opening of all the lanes should put a smile on at least a few faces of regular users, especially considering how the last weekend of closures went.
On Saturday a head on collision on the Mercier Bridge forced the complete closure of structure, causing a backlog so long (nearly 4kms) one person actually got out of their car to play a little golf on the 138 in the Whisky Trench.